PERMITS AND AUTHORIZATIONS

The Certified Closure Plan, Victoria Gold Mine, Victoria Gold Mines East Timmins Ltd, was accepted and filed with the Ministry of Northern Development and Mines on October 1, 2018 authorizing the production of up to 600 tonnes per day of ore from a permitted open pit volume of 862K tonnes utilizing a 4 to 1 strip ratio for ore to waste.

 

The project also has all of the required Environmental Compliance Approvals (“ECA”) for Industrial Sewage works and Air and the Permit to Take Water as listed in the following table and figures.